All structures assessed PS 48.3 (A29) – Rouville (RD 149) Structure studied for several abnormal-load convoys with a mass between 112.52 and 118.01 tonnes. The prestressed-concrete slab has 2 spans of 2 x 25.20 m. Bending moments in the deck under the convoy studied.