All structures assessed PS 4993 (A10) – Reignac (D 132E1) Structure studied for an abnormal-load convoy of 178.445 tonnes. The structure is a prestressed-concrete slab bridge (PSDP) with 4 spans. Bending moments in the deck under the convoy studied.