All structures assessed

PS 707 (A62) – Samazan (RD 933)

Structure studied for an abnormal-load convoy of 120 tonnes.

PS 707 (A62) – Samazan (RD 933)

The A62 PS 707 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 8.33 m, 13.88 m, 17.14 m and 8.33 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.