The structure is a PRAD (prestressed-girder overbridge) with 4 continuous skew spans of 9.36 m, 2 x 15.51 m and 9.36 m.
Structure studied for several abnormal-load convoys with a mass between 104 and 119.99 tonnes.
The structure is a PRAD (prestressed-girder overbridge) with 4 continuous skew spans of 9.36 m, 2 x 15.51 m and 9.36 m.