The structure is a composite twin-girder bridge. It has 2 identical spans of 2 x 18.00 m.
Structure studied for several abnormal-load convoys with a mass between 94.6 and 134.5 tonnes.
The structure is a composite twin-girder bridge. It has 2 identical spans of 2 x 18.00 m.