All structures assessed

PS 88.5 (A16)

Structure studied for several abnormal-load convoys with a mass between 94.6 and 134.5 tonnes.

PS 88.5 (A16)

The structure is a composite twin-girder bridge. It has 2 identical spans of 2 x 18.00 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.