All structures assessed

PS 908/01 (A85)

Structure studied for several abnormal-load convoys with a mass between 107.9 and 119.95 tonnes.

PS 908/01 (A85)

The prestressed-concrete slab has 2 skew spans of 26.333 m and 20.246 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.