All structures assessed

PS 93 (A54) – Saint-Gilles

Structure studied for an abnormal-load convoy of 72.753 tonnes.

PS 93 (A54) – Saint-Gilles

The A54 PS 93 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 13.30 m, 18.30 m, 15.30 m and 12.50 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.