Two prestressed slab overbridges: waterproofing, joints, concrete, drainage and bearings.
Two prestressed slab overbridges (PSDP) on the A64 and A66 motorways are the subject of rehabilitation studies and full design and project management by THEOREMS.
Works
- Renewal of waterproofing and surfacing
- Replacement of carriageway and footway joints
- Concrete repairs (crack injection, patch repairs)
- Improved drainage
- Repair of slope protection and bearing shelves






