All projects

Strengthening of the Moeuvres bridge by external prestressing

Renforcement par précontrainte extérieure du pont de Moeuvres

32.28 m VIPP over the Canal du Nord: additional external prestressing, composite strengthening and full rehabilitation.

This VIPP carries the RD930 over the Canal du Nord, on the boundary between Moeuvres and Graincourt-lès-Havrincourt. Its poor condition and reduced load capacity led the Nord Departmental Council to strengthen it with additional external prestressing.

Voids with corroded reinforcement and ducts, damp cracks, exposed steel: THEOREMS provides full design and project management for this complex operation.

Characteristics

  • Skewed simply supported deck of 32.28 m, 6 beams under the deck slab
  • 4T15S prestressing tendons on steel deviators

Works

  • Additional longitudinal external prestressing
  • Shear strengthening of the beams with bonded composite materials
  • Transverse flexural strengthening of the deck slab with composites
  • Jacking, replacement of bearings, new plinths and crossheads
  • Rebuilding of ballast walls, edge beams and cornices
  • Carriageway joints, concrete patch repairs, parapets
  • Refurbishment of the abutment masonry