All projects

Pontoons and suspended footbridge under boulevard Schuman

Pontons et passerelle suspendue sous le boulevard Schuman

Pontoons on piles and a footbridge suspended under the three boulevard Schuman bridges to cross the Scarpe at the Saint-Michel lock.

The project links the Saint-Laurent-Blangy and Saint-Nicolas districts to the centre of Arras by making the crossing of the Scarpe at the Canal Saint-Michel lock safe.

It required pontoons on piles and a footbridge suspended under the decks of the three boulevard Schuman bridges, with Corten steel parapets.

Characteristics

  • Pontoons on Ø 250 mm tubular steel piles
  • 47 m footbridge suspended under the existing decks

Photos

  • Pontoons and suspended footbridge under boulevard Schuman – view 1
  • Pontoons and suspended footbridge under boulevard Schuman – view 2
  • Pontoons and suspended footbridge under boulevard Schuman – view 3
  • Pontoons and suspended footbridge under boulevard Schuman – view 4
  • Pontoons and suspended footbridge under boulevard Schuman – view 5
  • Pontoons and suspended footbridge under boulevard Schuman – view 6
  • Pontoons and suspended footbridge under boulevard Schuman – view 7
  • Pontoons and suspended footbridge under boulevard Schuman – view 8

Similar projects