Replacement of a masonry bridge by a 28 m filler-beam deck on micropiles within the existing abutments, in a listed site.
The Pipes bridge, a masonry structure crossing the Cusancin at Baume-les-Dames, no longer offered a safe crossing. The Doubs Departmental Council decided to demolish and rebuild it.
The new 28 m span filler-beam deck is complemented by a cantilevered steel footbridge. It rests on micropiles drilled inside the existing abutments, which were cut down and strengthened, preserving the appearance of the listed site.
Characteristics
- Deck: 13 encased HEB 700 beams
- Span: 28 m
- Foundations: micropiles drilled in the existing abutments
- Equipment: cantilevered steel footbridge







