All projects

Reassessment and strengthening of the Mâture bridge

Recalcul et renforcement du pont de la Mâture

Steel bridge at the naval base checked under military loads, after a full diagnosis of its corrosion protection.

The Mâture bridge crosses the basin of the same name at the Cherbourg naval base. The study covered the check of its load capacity under special military loads, then the rehabilitation and strengthening works required.

A finite element model including the measured residual sections was used to study the behaviour of the structure under exceptional loads and the integrity of each of its members.

Services provided

  • Diagnosis of the corrosion protection: corrosion assessment, coating thicknesses, PIG microscope examination
  • Pull-off adhesion tests (NF EN ISO 16276-1) and soluble contaminants by the Bresle method
  • Advanced finite element model
  • Rehabilitation and strengthening studies

Photos

  • Reassessment and strengthening of the Mâture bridge – view 1
  • Reassessment and strengthening of the Mâture bridge – view 2
  • Reassessment and strengthening of the Mâture bridge – view 3
  • Reassessment and strengthening of the Mâture bridge – view 4
  • Reassessment and strengthening of the Mâture bridge – view 5

Similar projects