A1 and A26 motorways: refurbishment of 10 bridges

Autoroutes A1 et A26 : réfection de 10 ouvrages d’art

Restoration studies for ten standard structures (PIPBP, PIDP, PICF, PIPO, PSDP) on SANEF’s northern network.

Ten bridges on the A1 and A26 motorways, in the Arras, Saint-Quentin and Hauts d’Artois areas, were the subject of restoration studies carried out by THEOREMS.

The structures are of various types: slab, box or portal frame underbridges and overbridges, and prestressed slab overbridges.

Characteristics

  • Number of structures: 10
  • Types: PIPBP, PIDP, PICF, PIPO, PSDP…

Services provided

  • Renewal of waterproofing and surfacing
  • Replacement of carriageway and footway joints
  • Jacking and replacement of bearings, repair of plinths
  • Upgrading of edge restraint systems
  • Concrete repairs (crack injection, patch repairs)
  • Improved drainage
  • Repair of slope protection and bearing shelves

Photos

  • A1 and A26 motorways: refurbishment of 10 bridges – view 1
  • A1 and A26 motorways: refurbishment of 10 bridges – view 2
  • A1 and A26 motorways: refurbishment of 10 bridges – view 3
  • A1 and A26 motorways: refurbishment of 10 bridges – view 4
  • A1 and A26 motorways: refurbishment of 10 bridges – view 5
  • A1 and A26 motorways: refurbishment of 10 bridges – view 6
  • A1 and A26 motorways: refurbishment of 10 bridges – view 7
  • A1 and A26 motorways: refurbishment of 10 bridges – view 8

Similar projects