All projects

Reassessment and strengthening of the Montoussé bowstring bridge

Recalcul et renforcement du pont bowstring de Montoussé

43.70 m concrete bowstring restricted to 3.5 t: reassessment, carbon fibre strengthening and general rehabilitation.

The Montoussé bridge carries the RD142 over the Neste. This concrete bowstring suffered from major structural defects that had led to a 3.5 t weight restriction.

The Departmental Council commissioned THEOREMS to reassess the structure, then to design its strengthening and general rehabilitation and to supervise the works, carried out from sealed suspended scaffolding to protect the river.

Characteristics

  • Type: single-span reinforced concrete bowstring
  • Clear span: 43.70 m; effective span: 46.10 m
  • Overall width: 4.40 m (carriageway 2.40 m, footways 2 × 0.60 m)
  • Hangers: 40 × 30 cm; tie: 30 × 47 cm

Works

  • Sealed suspended scaffolding and protection of the Neste
  • Removal of unsound concrete, patch repairs and protective coating
  • New parapet on a side beam anchored into the ties
  • Repair of the abutment masonry
  • Strengthening with carbon fibre plates and fabrics
  • Waterproofing and wearing course

Photos

  • Reassessment and strengthening of the Montoussé bowstring bridge – view 1
  • Reassessment and strengthening of the Montoussé bowstring bridge – view 2
  • Reassessment and strengthening of the Montoussé bowstring bridge – view 3
  • Reassessment and strengthening of the Montoussé bowstring bridge – view 4

3D model

Simplified model, for illustration only. Rotate it with the mouse or your finger; zoom with the wheel or by pinching.

Similar projects