Better rebuilt than repaired: 13.05 m slab of precast beams on 22 m piles.
The RD2955 bridge crosses the Nartuby at Montferrat. Its major defects threatened the safety of users and the continuity of operation. The studies showed that rebuilding it was more advantageous than repairing it.
The new deck is a slab of precast beams fixed to crossheads, founded on 80 cm drilled piles, three per support line, 22 m long.
Characteristics
- Span: 13.05 m
- Foundations: 3 drilled piles Ø 80 cm per support line, 22 m long