Replacement of a 1922 bridge by a deck of 15 PRAD prestressed beams spanning 25 m, with a 40 m temporary footbridge during the works.
The Bateliers bridge (OA 5773) carries the RD95 over the Sambre at Hautmont. Built in 1922 with reinforced concrete beams, it was badly deteriorated and its load capacity was insufficient. The Nord Departmental Council decided to demolish and rebuild it.
The new PRAD-type deck rests on micropiles drilled in the existing abutments, which were cut down and strengthened. A 40 m temporary footbridge kept the pedestrian route open during the works.
Characteristics
- Deck: 15 PRAD prestressed beams
- Span: 25 m; width: 12 m
- Foundations: micropiles in the existing abutments