Pierre Trésaguet
1716–1796 · Cambered roads built in layers of stones of decreasing size (1764–1775)
Chief engineer of the généralité of Limoges, Pierre-Marie-Jérôme Trésaguet founded the rational construction of roads, in layers of stones of decreasing size.
Biography
Born on 15 January 1716 in Nevers, the youngest son of a family of engineers, Pierre Trésaguet joined the Ponts et Chaussées corps as a sub-inspector in Paris. In 1764 he was appointed chief engineer of the généralité of Limoges, where Turgot was intendant.
In 1775 he became Inspector General of the Ponts et Chaussées and wrote a memoir describing his method, then applied on the kingdom’s main roads. He died in 1796.
His method was used in France into the 19th century, before being superseded by McAdam’s cheaper one.
What he invented
Trésaguet dug a cambered formation parallel to the finished surface, set large stones on edge in it, then covered them with smaller stones and finally with a layer of broken stone the size of walnuts. The camber shed water towards the ditches.
He also argued for continuous maintenance by road menders rather than occasional forced labour.
His works
- Roads of the généralité of Limoges (from 1764).
- Memoir on the construction and maintenance of roads (1775).
- Method applied notably to the road from Paris to Spain via Toulouse.
What we owe Pierre Trésaguet
A road lasts if water does not get in: drainage of embankments, approaches and transition slabs is something we check systematically on structures, where water remains the leading cause of deterioration.
Sources
- Encyclopædia Britannica, « Pierre-Marie-Jérôme Trésaguet »
- A. Conchon, « Road construction in eighteenth-century France », Construction History Society
- G. Reverdy, « Histoire des routes de France » (Presses de l’ENPC, 1997)
- A. G. Bruce, « Highway Design and Construction » (1934)
Tester mes connaissances sur les grands bâtisseurs
See also
In our projects
A few structures of the same type studied by THEOREMS.
A28 motorway: detailed inspections and diagnosis for ALIS
Abnormal load route in Lozère: 123 structures assessed
Reconstruction of the Rametz bridge over the Hogneau
Eure Departmental Council: detailed inspection of three structures
A1 and A26 motorways: refurbishment of 10 bridges
Reconstruction of the Pipes bridge over the Cusancin