14.80 m reinforced concrete slab on 800 mm piles, with a temporary bridge to keep a business accessible.

The municipal bridge over the Risle at Brionne had major structural defects requiring its closure. A temporary bridge maintained access to a business and to the recycling centre during the works.

The new structure is a single-span 14.80 m reinforced concrete slab carrying a 3.50 m carriageway, on piles 800 mm in diameter and 10 m long.

Characteristics

  • Type: reinforced concrete slab, single 14.80 m span
  • Foundations: Ø 800 mm piles, 10 m long

Works

  • Floating booms downstream and demolition of the existing structure
  • Piles at the top of the banks and reinforced concrete crossheads
  • Slab of precast elements (slab beams or precast planks)
  • Waterproofing, wearing course, footways and parapets
  • Planting of the slopes