Reconstruction of the bridge over the Solre

Reconstruction du pont sur la Solre

Demolition of a 12 m reinforced concrete bridge and construction of a 9-beam deck on 20 m micropiles.

The rue de la Gare bridge, crossing the Solre at Obrechies, was in poor condition and no longer offered a safe crossing. Built with reinforced concrete beams on the brick abutments of an older structure, it was about 12 m long.

The new deck has 9 beams: 7 inverted-T beams and 2 L-shaped end beams, about 53 cm deep. It is founded on 20 m drilled micropiles in the existing abutment.

Characteristics

  • Deck: 9 beams (7 inverted-T, 2 L-shaped end beams), 53 cm deep
  • Foundations: 20 m drilled micropiles

Photos

  • Reconstruction of the bridge over the Solre – view 1
  • Reconstruction of the bridge over the Solre – view 2
  • Reconstruction of the bridge over the Solre – view 3
  • Reconstruction of the bridge over the Solre – view 4
  • Reconstruction of the bridge over the Solre – view 5
  • Reconstruction of the bridge over the Solre – view 6

Similar projects